Project |
Tengiz foundation 3GP survey support |
Year |
2016 - 2018 |
Client |
FKP/Vemya |
Contract |
Provide surveyors and survey equipment |
|
|
Synopsis |
In Tengiz, the construction of the third generation processing plant was started. Over 30,000 piles needed to be installed by the main contractor Keller/Vremya. FKP was selected to execute the pile testing and the survey support for the positioning of the foundation piles. CSGeo supported FKP with the freelance surveyors, chief surveyor and Leica total stations during the project. In addtion, CSGeo provided an automated pile test system for high end testing of the installed piles. |
|