Project

 Rheotune survey Prorva Channel

 Year
2017-2018
Client
Semarco LLP (Archirodon)
Contract
Execute and report siltation monitoring during maintenance dredging 
 
 
Synopsis

For the Tengiz 3GP project, large modules would be transported over the Caspian Sea to Prora Port. CSGeo  was contracted by Semarco to check the siltation of the Prorva Channel, before and after the maintenance dredging.

 

The data was collected and QC'ed by CSGEO sureyors and send to Stema Systems in the Netherlands for further analysis.