Badamsha II wind farm road survey

ProjectBadamsha II wind farm road survey, Kazakhstan
Year2021
ClientMammoet Kazakhstan
ContractLevel survey of the crawler crane tracks between the wind turbine locations

Synopsis

At the Badamsha II wind farm in the Aktobe region, the wind turbines were erected with a crawler crane. This crane can only travel over roads with a limited slope and tilt: a maximum of 5.7% in-line and 2% cross slope. Mammoet Kazakhstan contracted CSGeo to survey the condition of about 6 km of crane tracks between the turbine locations. A team of three surveyors with a Trimble R8 RTK GPS system and a Leica DNA03 digital level was mobilised from Atyrau to the site, about 125 km from Aktobe. Every track was staked out with points every 25 m left and right, and levelled along the crawler centre lines at a 5 m interval. Sections outside the slope specifications were logged, reported to Mammoet and re-surveyed at a 1 m interval. The data was processed every evening and sent to the office for analysis. The survey was completed in time (13 to 22 September 2021) and without incidents. As part of the quality check, 250 m was re-surveyed.